
Situated in a quiet, residential neighbourhood within walking distance of Tavira these two bedroom, two bathroom apartments are currently under construction. Prices start from
- Tavira
- Apartment
- 2 Bedrooms
- 2` Bathrooms
- Air conditioning
- Balcony
- Fitted wardrobes
- Heating system
- Heating, underfloor
- Kitchen, fully fitted
- Lift
- Parking, underground
- Pool, shared
- Security electric shutters
- Security video entrance system
- Close to restaurants/shops
- Close to the beach
- Country side views
- Ocean views
- Peaceful location
With generous outside spaces, terraces and verandas they also benefit from a lift, air conditioning, fully equipped kitchens and underfloor heating in the bathrooms. Just a few minutes drive
from central Tavira these apartments would be ideal for permanent living or as a holiday home and also offer good rental potential.
Average dimensions as apartments vary:
Entrance hall (11.2m²) with video entry-phone
Open-plan living/dining area (27m²) with access to a veranda (9.2m²)
Modern, open plan kitchen (10.9m²) equipped with integrated appliances and silstone work tops
Bedroom 1 (15.5m²) Double bedroom with built in wardrobes, floating wood floors, en-suite bathroom and access to a veranda (10.7m²) shared with bedroom 2
En-suite (5.3m²) with bath and shower over, toilet, bidet and hand basin
Bedroom 2 (12m²) Double bedroom with built in wardrobes, floating wood floors and sliding doors to the veranda
Bathroom (4m²) with toilet, shower and hand basin
Air conditioning
Heating/cooling units installed in living room and bedrooms
Under floor heating in bathrooms
First and second floors have a share of the roof terrace. Ground floors have a private terrace
Allocated space in underground car park
Communal walled pool and sunbathing area
Far reaching views over Tavira to the coastline
Utilities: All mains
Energy Rating: Pre classification A
Build Areas: from 84 – 103m²
Other information:
. Lift, video entry phone
. Electric shutters
. Under 5 minutes to central Tavira
. 30 minutes to Faro airport
. Expected Completion: End 2018